{"id":22602,"date":"2023-12-27T08:58:40","date_gmt":"2023-12-27T06:58:40","guid":{"rendered":"https:\/\/zurnalsiepirkumi.lv\/?p=22602"},"modified":"2023-12-27T08:58:41","modified_gmt":"2023-12-27T06:58:41","slug":"rail-baltica-projekta-istenosanai-2024-gada-planots-apgut-1747-miljoni-eiro","status":"publish","type":"post","link":"https:\/\/zurnalsiepirkumi.lv\/?p=22602","title":{"rendered":"Rail Baltica projekta \u012bsteno\u0161anai 2024. gad\u0101 pl\u0101nots apg\u016bt 174,7 miljoni eiro"},"content":{"rendered":"\n<p>Satiksmes ministrija<\/p>\n\n\n\n<p>Rail Baltica projekta \u012bsteno\u0161ana Latvij\u0101 ir Satiksmes ministrijas (SM) nemain\u012bga priorit\u0101te. 2024. gada bud\u017eet\u0101\u00a0pl\u0101nots apg\u016bt 174,7 miljoni eiro, no tiem 115,3 miljoni eiro ir piesaist\u012btais ES finans\u0113jums. Galvenais uzsvars tiks likts uz Rail Baltica pamattrases projekt\u0113\u0161anas un uzs\u0101kto b\u016bvniec\u012bbas darbu turpin\u0101\u0161anu, k\u0101 ar\u012b pamattrases b\u016bvdarbu uzs\u0101k\u0161anu \u0101rpus R\u012bgas.<\/p>\n\n\n\n<p>\u201cRail Baltica projekts \u0161obr\u012bd ieiet b\u016bvniec\u012bbas f\u0101z\u0113 vis\u0101s tr\u012bs Baltijas valst\u012bs ar m\u0113r\u0137i savienot tr\u012bs Baltijas valstis ar Poliju l\u012bdz 2030. gadam, tostarp paredzot R\u012bgas integr\u0101ciju dzelzce\u013ca l\u012bnijas b\u016bvniec\u012bbas pirmaj\u0101 f\u0101z\u0113. Latvij\u0101 ar pie\u0161\u0137irto finans\u0113jumu uzs\u0101ksim pirmos pamattrases b\u016bvdarbus priorit\u0101r\u0101 dienvidu virzien\u0101. Vienlaikus turpin\u0101sim pamattrases projekt\u0113\u0161anu, kas ir kritisks priek\u0161nosac\u012bjums lielapjoma b\u016bvdarbu turpin\u0101jumam. Ar papildu finans\u0113jumu projekt\u0113\u0161anas darbiem \u0161is uzdevums j\u0101paveic l\u012bdz n\u0101kam\u0101 gada beig\u0101m,\u201d skaidro satiksmes ministrs&nbsp;<strong>Kaspars Bri\u0161kens.<\/strong><\/p>\n\n\n\n<p>N\u0101kamgad turpin\u0101sies R\u012bgas Centr\u0101l\u0101 dzelzce\u013ca mezgla un ar to saist\u012bt\u0101s infrastrukt\u016bras b\u016bvdarbi, jo R\u012bgas integr\u0101cija ir neat\u0146emama Rail Baltica sast\u0101vda\u013ca. Kopum\u0101 2024. gad\u0101 \u0161o b\u016bvdarbu 3. f\u0101zei pl\u0101nots apg\u016bt 65 milj. eiro. Finans\u0113jums dos iesp\u0113ju turpin\u0101t darbus&nbsp;R\u012bgas Centr\u0101l\u0101 mezgla dienvidu pus\u0113 un uzs\u0101kt dzelzce\u013ca sist\u0113mu izb\u016bvi, tostarp slie\u017eu ce\u013cu un kontaktt\u012bklu, dzelzce\u013ca signaliz\u0101ciju un in\u017eeniert\u012bklu ier\u012bko\u0161anu. T\u0101pat pl\u0101nots s\u0101kt jaun\u0101 Rail Baltica dzelzce\u013ca tilta izb\u016bvi Daugavas labaj\u0101 krast\u0101.<\/p>\n\n\n\n<p>R\u012bgas Centr\u0101l\u0101s stacijas zon\u0101 pl\u0101nots uzs\u0101kt stacijas dienvidu puses in\u017eeniert\u012bklu izb\u016bvi un ies\u0101kt apdares darbus, turpin\u0101t jumta izb\u016bvi, k\u0101 ar\u012b veikt eskalatoru un liftu izb\u016bvi un stacijas zonas labiek\u0101rtojuma darbus. N\u0101kamgad pl\u0101nots pabeigt stacijas neso\u0161o konstrukciju izb\u016bvi, k\u0101 ar\u012b stacijas p\u0101rvadu un platformu konstrukciju darbus.<\/p>\n\n\n\n<p>T\u0101pat 2024. gad\u0101 turpin\u0101sies Rail Baltica stacijas un saist\u012bt\u0101s infrastrukt\u016bras lidost\u0101 \u201eR\u012bga\u201d izb\u016bve. B\u016bvdarbu 2. f\u0101zei 2024. gad\u0101 novirz\u012bti 30,7 milj. eiro. Ar pie\u0161\u0137irto finans\u0113jumu tiks nosl\u0113gta autost\u0101vvietas izveide un turpin\u0101sies Latvij\u0101 gar\u0101k\u0101s dzelzce\u013ca estak\u0101des izb\u016bve.<\/p>\n\n\n\n<p>Pamattrases b\u016bvdarbiem priorit\u0101r\u0101 dienvidu jeb Lietuvas virzien\u0101, kas ir tehniski visgatav\u0101kais un ar\u012b strat\u0113\u0123iski noz\u012bm\u012bg\u0101kais posms, 2024.gada bud\u017eet\u0101 atv\u0113l\u0113ti 26 milj. eiro. Finans\u0113jums paredz\u0113ts pamattrases pirmajiem b\u016bvdarbiem 13 km garum\u0101. Papildus 2024.gada bud\u017eet\u0101 pl\u0101nots apg\u016bt aptuveni 800 t\u016bkst. eiro b\u016bvniec\u012bbas lo\u0123istikas b\u0101zes iek\u0101rto\u0161anai Iecavas infrastrukt\u016bras apkopes punkta teritorij\u0101 un savienojuma izveidei ar eso\u0161o dzelzce\u013ca t\u012bklu tehnikas un materi\u0101lu transport\u0113\u0161anai. Dr\u012bzum\u0101 pl\u0101nots nosl\u0113gt l\u012bgumu par Rail Baltica pamattrases b\u016bvdarbiem ar publisk\u0101 iepirkum\u0101 izv\u0113l\u0113to b\u016bvnieku. Pirmie b\u016bvdarbi gaid\u0101mi 2024. gada s\u0101kum\u0101.<\/p>\n\n\n\n<p>Papildus 2024.gada bud\u017eet\u0101 pl\u0101nots finans\u0113jums 20,7 milj. eiro apm\u0113r\u0101 b\u016bvniec\u012bbai nepiecie\u0161amo nekustamo \u012bpa\u0161umu atsavin\u0101\u0161anai.<\/p>\n\n\n\n<p>Rail Baltica pamattrases projekt\u0113\u0161anai, tostarp projekt\u0113\u0161anas darbiem \u010detros&nbsp; Latvijas posmos, t.sk. Upeslejas \u2013 Salaspils \u2013 Misa, Vanga\u017ei \u2013 Igaunijas robe\u017ea, Misa \u2013 Lietuvas robe\u017ea posmos un R\u012bgas Centr\u0101l\u0101 dzelzce\u013ca mezgla sekcij\u0101, kopum\u0101 pie\u0161\u0137irts finans\u0113jums 19,6 milj. eiro apm\u0113r\u0101. Projekt\u0113\u0161anas darbus, iz\u0146emot R\u012bgas posmu, pl\u0101nots pabeigt l\u012bdz 2024. gada beig\u0101m.<\/p>\n\n\n\n<p>T\u0101pat pl\u0101nots turpin\u0101t projekt\u0113\u0161anas darbus punktveida objektos, tostarp 16 re\u0123ion\u0101lo mobilit\u0101tes punktu, Salaspils Intermod\u0101l\u0101 lo\u0123istikas centra, Skultes infrastrukt\u016bras apkopes punkta un Rail Baltica pasa\u017eieru rito\u0161\u0101 sast\u0101va apkopes punkta Jaunm\u0101rup\u0113 projekt\u0113\u0161anu.&nbsp;\u0160im m\u0113r\u0137im 2024. gada bud\u017eet\u0101 novirz\u012btas invest\u012bcijas 8,1 milj. eiro apm\u0113r\u0101.<\/p>\n\n\n\n<p>Papildus bud\u017eet\u0101 paredz\u0113ts finans\u0113jums ar\u012b Rail Baltica kust\u012bbas vad\u012bbas centra Latvij\u0101 tehniski ekonomisk\u0101 pamatojuma izstr\u0101dei, piem\u0113rot\u0101k\u0101 novietojuma izv\u0113lei un ski\u010du projektam. Kust\u012bbas vad\u012bbas centrs nodro\u0161in\u0101s vilcienu kust\u012bbas organiz\u0113\u0161anu Latvij\u0101, paredzot iesp\u0113ju organiz\u0113t un p\u0101rraudz\u012bt vilcienu kust\u012bbu ar\u012b vis\u0101 Rail Baltica dzelzce\u013ca l\u012bnij\u0101.<\/p>\n\n\n\n<p>SM 2024. gada bud\u017eets nozares att\u012bst\u012bbai ir 788 miljoni eiro. Sagaid\u0101ms, ka n\u0101kamgad bud\u017eet\u0101 pl\u0101notie pas\u0101kumi dos pozit\u012bvu pienesumu nozares priorit\u0101t\u0113m \u2013 virz\u012bbai uz za\u013co kursu, dro\u0161\u012bbas un piek\u013c\u016bstam\u012bbas nodro\u0161in\u0101\u0161anai, labas p\u0101rvald\u012bbas ievie\u0161anai un starptautisk\u0101s konkur\u0113tsp\u0113jas stiprin\u0101\u0161anai.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rail Baltica projekta \u012bsteno\u0161ana Latvij\u0101 ir Satiksmes ministrijas (SM) nemain\u012bga priorit\u0101te. 2024. gada bud\u017eet\u0101\u00a0pl\u0101nots apg\u016bt 174,7 miljoni eiro, no tiem 115,3 miljoni eiro ir piesaist\u012btais ES finans\u0113jums. Galvenais uzsvars tiks likts uz Rail Baltica pamattrases projekt\u0113\u0161anas un uzs\u0101kto b\u016bvniec\u012bbas darbu turpin\u0101\u0161anu, k\u0101 ar\u012b pamattrases b\u016bvdarbu uzs\u0101k\u0161anu \u0101rpus R\u012bgas.<\/p>\n","protected":false},"author":1938,"featured_media":22601,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[233,120,46],"tags":[],"_links":{"self":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts\/22602"}],"collection":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/users\/1938"}],"replies":[{"embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=22602"}],"version-history":[{"count":1,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts\/22602\/revisions"}],"predecessor-version":[{"id":22603,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts\/22602\/revisions\/22603"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/media\/22601"}],"wp:attachment":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=22602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=22602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=22602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}