{"id":18850,"date":"2022-09-14T10:25:38","date_gmt":"2022-09-14T08:25:38","guid":{"rendered":"https:\/\/zurnalsiepirkumi.lv\/?p=18850"},"modified":"2022-09-14T10:25:39","modified_gmt":"2022-09-14T08:25:39","slug":"latvijas-un-igaunijas-veja-parka-elwind-projekta-turpmako-virzibu-parnems-liaa","status":"publish","type":"post","link":"https:\/\/zurnalsiepirkumi.lv\/?p=18850","title":{"rendered":"Latvijas un Igaunijas v\u0113ja parka \u201cElwind\u201d projekta turpm\u0101ko virz\u012bbu p\u0101r\u0146ems LIAA"},"content":{"rendered":"\n<p>Ekonomikas ministrija<\/p>\n\n\n\n<p>\u0160.g. 13. septembr\u012b Ministru kabineta s\u0113d\u0113 tika izskat\u012bts konceptu\u0101lais zi\u0146ojums \u201cPar Latvijas un Igaunijas atkrastes v\u0113ja ener\u0123ijas kopprojekta \u201cElwind\u201d l\u012bdz\u0161in\u0113jo un turpm\u0101ko att\u012bst\u012bbu\u201d, atk\u0101rtoti atbalstot Latvijas akt\u012bvu iesaisti projekt\u0101, kas n\u0101kotn\u0113 stiprin\u0101s abu valstu ener\u0123\u0113tisko neatkar\u012bbu, nodro\u0161inot elektroener\u0123ijas jaudu 700 &#8211; 1000 MW apm\u0113r\u0101.<\/p>\n\n\n\n<p>\u201cElwind\u201d atkrastes v\u0113ja parks b\u016bs noz\u012bm\u012bgs projekts Baltijas j\u016bras re\u0123ionam ar lielu ekonomisko un soci\u0101lo ietekmi, t\u0101d\u0113\u013c projekta att\u012bst\u012bbas n\u0101kamaj\u0101 stadij\u0101 no Latvijas puses ar to str\u0101d\u0101s Latvijas Invest\u012bciju un att\u012bst\u012bbas a\u0123ent\u016bra (LIAA), nodro\u0161inot parka b\u016bvniec\u012bbai nepiecie\u0161amo at\u013cauju sa\u0146em\u0161anu un ietekmes uz vidi nov\u0113rt\u0113jumus. T\u0101d\u0101 veid\u0101 tiks mazin\u0101ta projekta ievie\u0161anas ietekme uz elektroener\u0123ijas p\u0101rvades tarifu pat\u0113r\u0113t\u0101jiem.<\/p>\n\n\n\n<p>Realiz\u0113jot \u201cElwind\u201d projektu, palielin\u0101sies Latvijas energoapg\u0101des dro\u0161\u012bba un potenci\u0101li n\u0101kotn\u0113 var\u0113tu samazin\u0101ties ar\u012b ener\u0123ijas ra\u017eo\u0161anas izmaksas. Vienlaikus m\u016bsu izmantot\u0101 ener\u0123ija k\u013c\u016bs za\u013c\u0101ka. \u0160aj\u0101 nozar\u0113 ir augsts invest\u012bciju piesaistes potenci\u0101ls, kas noz\u012bm\u0113, ka, veicot nepiecie\u0161amos priek\u0161darbus, uz\u0146\u0113m\u0113ji b\u016bs gatavi iesaist\u012bties, p\u0101r\u0146emot da\u013cu risku uz sevi. Paral\u0113li \u201cElwind\u201d projektam Latvij\u0101 tiks att\u012bst\u012bti ar\u012b citi maz\u0101kas jaudas v\u0113ja parki, kas noz\u012bm\u0113, ka sal\u012bdzino\u0161i net\u0101l\u0101 n\u0101kotn\u0113 m\u0113s no elektroener\u0123ijas iepirc\u0113jiem var\u0113tu k\u013c\u016bt par elektroener\u0123ijas eksport\u0113t\u0101jiem, sara\u017eojot vair\u0101k nek\u0101 Latvija sp\u0113j pat\u0113r\u0113t,\u201d uzsver\u00a0LIAA direktors Kaspars Ro\u017ekalns.<\/p>\n\n\n\n<p>Saska\u0146\u0101 ar veikt\u0101s priek\u0161izp\u0113tes rezult\u0101tiem, Latvij\u0101 atkrastes v\u0113ja parks var\u0113tu tikt izb\u016bv\u0113ts Kurzemes piekrast\u0113 starp Liep\u0101ju un Ventspili, kur p\u0113c veiktajiem p\u0113t\u012bjumiem ir visatbilsto\u0161\u0101kie apst\u0101k\u013ci v\u0113ja parka att\u012bst\u012b\u0161anai.&nbsp; J\u0101uzsver, ka v\u0113ja turb\u012bnas tiks izb\u016bv\u0113tas aptuveni 20 km no krasta l\u012bnijas. Projekta \u201cElwind\u201d laika pl\u0101ns paredz, ka ietekmes uz vidi nov\u0113rt\u0113jumi un visas nepiecie\u0161am\u0101s b\u016bvniec\u012bbas at\u013caujas tiks saska\u0146otas l\u012bdz 2025. gadam, bet 2026. gad\u0101 pl\u0101nots organiz\u0113t izsoli komersantiem, kuri v\u0113l\u0113sies iesaist\u012bties projekta turpm\u0101kaj\u0101 realiz\u0101cij\u0101. K\u0101 projekta nosl\u0113guma termi\u0146\u0161 tiek pl\u0101nots 2030. gads. B\u016btiski uzsv\u0113rt, ka, saska\u0146\u0101 ar p\u0113t\u012bjumu centra SKDS 2022. gada apr\u012bl\u012b un maij\u0101 veikt\u0101s aptaujas rezult\u0101tiem, 77% Latvijas iedz\u012bvot\u0101ju atbalsta v\u0113ja parku b\u016bvniec\u012bbu.<\/p>\n\n\n\n<p>\u201cElwind\u201d projekta \u012bsteno\u0161ana dos ieguld\u012bjumu ar\u012b citu saist\u012bto ener\u0123\u0113tikas un klimata politikas m\u0113r\u0137u sasnieg\u0161an\u0101, tai skait\u0101 energoefektivit\u0101tes, ener\u0123\u0113tisk\u0101s dro\u0161\u012bbas un siltumn\u012bcefektu izraiso\u0161o g\u0101zu samazin\u0101\u0161anas jom\u0101s. T\u0101pat projekts b\u016bs noz\u012bm\u012bgs ieguld\u012bjums Eiropas za\u013c\u0101 kursa m\u0113r\u0137u sasnieg\u0161anai, t\u0101d\u0113\u013c projekta realiz\u0101cijai pl\u0101nots piesaist\u012bt ar\u012b Eiropas infrastrukt\u016bras savieno\u0161anas instrumenta (CEF) finans\u0113jumu, t\u0101d\u0101 veid\u0101 sedzot l\u012bdz pat pusei no kop\u0113j\u0101m piesl\u0113guma infrastrukt\u016bras izmaks\u0101m.<\/p>\n\n\n\n<p>K\u0101 zin\u0101ms, 2019. gad\u0101 Igaunijas vald\u012bbas p\u0101rst\u0101vji uzs\u0101ka sarunas ar Latvijas pusi par iesp\u0113jamu kop\u012bgu atkrastes v\u0113ja parka projekta \u012bsteno\u0161anu. 2019. gada decembr\u012b, ekonomikas ministram tiekoties ar Igaunijas ekonomikas un komunik\u0101ciju ministru, tika pan\u0101kta konceptu\u0101la vieno\u0161an\u0101s par \u0161\u0101da projekta \u012bsteno\u0161anu. Latvijas Ekonomikas ministrijas un Igaunijas Ekonomikas un komunik\u0101ciju ministrijas memorands nosaka juridiski nesaisto\u0161u ietvaru kop\u012bgai atkrastes v\u0113ja parka projekta p\u0101rvald\u012bbai un finans\u0113\u0161anai starp Igaunijas Ekonomikas un komunik\u0101ciju ministriju un Latvijas Ekonomikas ministriju. Prec\u012bzs izmaksu un ieguvumu sadal\u012bjums tiks noteikts, pamatojoties uz priek\u0161izp\u0113tes un izmaksu un ieguvumu anal\u012bzes rezult\u0101tiem. Latvijas un Igaunijas atkrastes v\u0113ja parka kopprojekta \u012bsteno\u0161ana ir iek\u013cauta Latvijas Nacion\u0101laj\u0101 ener\u0123\u0113tikas un klimata pl\u0101n\u0101 2030. gadam.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u0160.g. 13. septembr\u012b Ministru kabineta s\u0113d\u0113 tika izskat\u012bts konceptu\u0101lais zi\u0146ojums \u201cPar Latvijas un Igaunijas atkrastes v\u0113ja ener\u0123ijas kopprojekta \u201cElwind\u201d l\u012bdz\u0161in\u0113jo un turpm\u0101ko att\u012bst\u012bbu\u201d, atk\u0101rtoti atbalstot Latvijas akt\u012bvu iesaisti projekt\u0101, kas n\u0101kotn\u0113 stiprin\u0101s abu valstu ener\u0123\u0113tisko neatkar\u012bbu, nodro\u0161inot elektroener\u0123ijas jaudu 700 &#8211; 1000 MW apm\u0113r\u0101.<\/p>\n","protected":false},"author":1938,"featured_media":18849,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[418],"tags":[],"_links":{"self":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts\/18850"}],"collection":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/users\/1938"}],"replies":[{"embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18850"}],"version-history":[{"count":1,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts\/18850\/revisions"}],"predecessor-version":[{"id":18851,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts\/18850\/revisions\/18851"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/media\/18849"}],"wp:attachment":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18850"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=18850"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=18850"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}