{"id":17396,"date":"2022-03-22T10:09:00","date_gmt":"2022-03-22T08:09:00","guid":{"rendered":"https:\/\/zurnalsiepirkumi.lv\/?p=17396"},"modified":"2022-03-23T10:11:56","modified_gmt":"2022-03-23T08:11:56","slug":"administrativa-sloga-samazinasana-lielu-veja-parku-izveidei-latvija-sekmes-energetisko-neatkaribu","status":"publish","type":"post","link":"https:\/\/zurnalsiepirkumi.lv\/?p=17396","title":{"rendered":"Administrat\u012bv\u0101 sloga samazin\u0101\u0161ana lielu v\u0113ja parku izveidei Latvij\u0101 sekm\u0113s ener\u0123\u0113tisko neatkar\u012bbu"},"content":{"rendered":"\n<p>2022. gada 22. mart\u0101 Ministru kabinet\u0101 apstiprin\u0101ts Vides aizsardz\u012bbas un re\u0123ion\u0101l\u0101s att\u012bst\u012bbas ministrijas (VARAM) sagatavotais informat\u012bvais zi\u0146ojums \u201cVES parku virs 50MW \u012bsteno\u0161anas proced\u016bru optimiz\u0113\u0161ana\u201d, kas paredz priek\u0161likumus par t\u016bl\u012bt\u0113jiem iesp\u0113jamiem risin\u0101jumiem ener\u0123ijas ra\u017eo\u0161anas atbalstam no atjaunojamiem energoresursiem.<\/p>\n\n\n\n<p>Ministrs&nbsp;Art\u016brs Toms&nbsp;Ple\u0161s&nbsp;(AP!): \u201cKatru reizi, kad izmantojam ener\u0123iju, kas ieg\u016bta no dabasg\u0101zes, m\u0113s finans\u0113jam Krievijas karu Ukrain\u0101. Tas nav pie\u013caujams! Turkl\u0101t, lai iev\u0113rojami mazin\u0101tu ar\u012b m\u016bsu pa\u0161u ener\u0123\u0113tisko atkar\u012bbu no tre\u0161aj\u0101m valst\u012bm, esam n\u0101ku\u0161i klaj\u0101 ar&nbsp;risin\u0101jumu, k\u0101 pa\u0101trin\u0101t lielu v\u0113ja parku izveidi Latvijas teritorij\u0101. Krievijas agresija ir nep\u0101rprotami likusi noprast, ka ar\u012b ener\u0123\u0113tikas jom\u0101 Eiropai ir j\u0101k\u013c\u016bst pa\u0161pietiekamai, un, lai to sasniegtu, mums ir b\u016btiski j\u0101k\u0101pina atjaunojamo energoresursu izmanto\u0161anas jaudas k\u0101 siltumener\u0123ijas, t\u0101 elektroener\u0123ijas ra\u017eo\u0161an\u0101. Tas j\u0101dara izl\u0113m\u012bgi, jo laiks nav m\u016bsu sabiedrotais!\u201d<\/p>\n\n\n\n<p>Latvij\u0101 \u0161obr\u012bd ir viszem\u0101kais v\u0113ja ener\u0123ijas jaudu apjoms Baltijas valstu vid\u016b. V\u0113ja ener\u0123ija nosedz tikai 3% no elektroener\u0123ijas pieg\u0101des iek\u0161\u0113jam tirgum kop\u0113j\u0101 apjoma. L\u012bdz \u0161im v\u0113ja un saules potenci\u0101ls izmantots minim\u0101li, t\u0101d\u0113\u013c j\u0101v\u0113rt\u0113, k\u0101 veicin\u0101t atjaunojam\u0101s ener\u0123ijas ra\u017eo\u0161anu gan uzst\u0101dot jaunas jaudas, gan palielinot eso\u0161\u0101s. Tas sekm\u0113tu Latvijas virz\u012bbu uz ener\u0123\u0113tisko neatkar\u012bbu un dro\u0161\u012bbu, klimatam draudz\u012bgu (ne\u2013emisiju) tehnolo\u0123iju ievie\u0161anu, vienlaikus uzlabojot ener\u0123ijas importa\u2013eksporta bilanci un sekm\u0113tu ener\u0123ijas resursu izmaksu samazin\u0101\u0161anos. T\u0101dej\u0101di tiktu mazin\u0101ti ar\u012b Nacion\u0101l\u0101 ener\u0123\u0113tikas un klimata pl\u0101na 2021. \u2013 2030. gadam ievie\u0161anas riski par lielas jaudas v\u0113ja parku (s\u0101kot ar jaudu virs 50 MW) izb\u016bvi Latvij\u0101 l\u012bdz 2030. gadam.<\/p>\n\n\n\n<p>Sagatavotais priek\u0161likums neparedz v\u0113ja elektrostaciju (VES) ieceres iesniedz\u0113ju atbr\u012bvot no pien\u0101kuma iev\u0113rot vides aizsardz\u012bbas pras\u012bbas paredz\u0113tajai darb\u012bbai t\u0101s norises viet\u0101. Paredz\u0113ts, ka Valsts vides dienests veiks izv\u0113rt\u0113jamu un izstr\u0101d\u0101s tehniskos noteikumus, kas j\u0101\u0146em v\u0113r\u0101 t\u0101l\u0101k\u0101 projekta izstr\u0101d\u0113, lai nov\u0113rt\u0113tu riskus un rad\u012btu nosac\u012bjumus gan projekta realiz\u0101cijai, gan dabas aizsardz\u012bbai, k\u0101 ar\u012b inform\u0113tu sabiedr\u012bbu un uzklaus\u012btu t\u0101s viedokli.<\/p>\n\n\n\n<p>T\u0101pat tiktu noteikti kompens\u0113jo\u0161ie pas\u0101kumi negat\u012bvo ietekmju l\u012bdzsvaro\u0161anai, to izmaksas segtu paredz\u0113t\u0101s darb\u012bbas veic\u0113js. K\u0101 ar\u012b v\u0113ja parku b\u016bvniec\u012bbai saglab\u0101sies \u012apa\u0161i aizsarg\u0101jamo dabas teritoriju normat\u012bvaj\u0101 regul\u0113jam\u0101 jau noteiktie ierobe\u017eojumi, k\u0101 ar\u012b citas normat\u012bvajos aktos noteikt\u0101s pras\u012bbas (aizsargjoslas ap v\u0113ja elektrostacij\u0101m).<\/p>\n\n\n\n<p>Kopum\u0101 VARAM pied\u0101v\u0101jums, izstr\u0101d\u0101jot speci\u0101lo likumu, ir ietekmes uz vidi nov\u0113rt\u0113jumu (IVN) aizst\u0101t ar tehniskajiem noteikumiem (30 dienas), t\u0101l\u0101k Ministru kabinet\u0101 tiktu izskat\u012bts ar\u012b jaut\u0101jums par nacion\u0101l\u0101 intere\u0161u objekta (NIO) statusa noteik\u0161anu VES b\u016bv\u0113m vai teritorijai (30 dienas). Ministru kabinets izdotu noteikumus, tai skait\u0101 paredzot VES att\u012bst\u012bt\u0101ja pien\u0101kumus gan teritorijas izmanto\u0161an\u0101, gan ar\u012b ra\u017eo\u0161an\u0101. \u0160ajos noteikumos var tikt ietverti ar\u012b citi nosac\u012bjumi, piem\u0113ram, par noteiktiem izpild\u012bjumiem viet\u0113j\u0101s pa\u0161vald\u012bbas interes\u0113s. Savuk\u0101rt p\u0113c NIO statusa noteik\u0161anas B\u016bvniec\u012bbas valsts kontroles birojs (BVKB) nodro\u0161in\u0101tu b\u016bvvaldes funkcijas gan izskatot b\u016bvniec\u012bbas ieceres iesniegumu (b\u016bvat\u013caujas izsnieg\u0161ana 30 darba dienas) un pie\u0146emot l\u0113mumu, gan ar\u012b veicot b\u016bvdarbu kontroli un objekta pie\u0146em\u0161anu ekspluat\u0101cij\u0101. BVKB var\u0113tu nodro\u0161in\u0101t vienveid\u012bgu pieeju b\u016bvniec\u012bbas ieceru izv\u0113rt\u0113\u0161an\u0101, kompetences koncentr\u0113\u0161anu vien\u0101 iest\u0101d\u0113 un vienlaikus samazin\u0101tu pa\u0161vald\u012bbu b\u016bvval\u017eu noslodzi ar t\u0101diem objektiem, kas nav tipiski b\u016bvvaldes ikdienas darb\u0101.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>2022. gada 22. mart\u0101 Ministru kabinet\u0101 apstiprin\u0101ts Vides aizsardz\u012bbas un re\u0123ion\u0101l\u0101s att\u012bst\u012bbas ministrijas (VARAM) sagatavotais informat\u012bvais zi\u0146ojums \u201cVES parku virs 50MW \u012bsteno\u0161anas proced\u016bru optimiz\u0113\u0161ana\u201d, kas paredz priek\u0161likumus par t\u016bl\u012bt\u0113jiem iesp\u0113jamiem risin\u0101jumiem ener\u0123ijas ra\u017eo\u0161anas atbalstam no atjaunojamiem energoresursiem.<\/p>\n","protected":false},"author":1938,"featured_media":17395,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[418],"tags":[],"_links":{"self":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts\/17396"}],"collection":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/users\/1938"}],"replies":[{"embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17396"}],"version-history":[{"count":1,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts\/17396\/revisions"}],"predecessor-version":[{"id":17397,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/posts\/17396\/revisions\/17397"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=\/wp\/v2\/media\/17395"}],"wp:attachment":[{"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17396"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17396"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zurnalsiepirkumi.lv\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17396"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}